|
|
M-Series Line of Production Equipment
The M-Series is designed for production filling rates up to 200 cylinders per hour.
The M-Series plants are quickly assembled and are low cost compared to the high costs
of building construction. All M-Series modules are available for Class 1 Division 1
ratings in any voltage requirements. The M-Series is a complete, totally integrated,
modular, turn-key filling plant.
MFM - Mobile Filling Module
The MFM is the filling module of the M-Series Plant. The MFM is designed Class 1 Division 1 with driven roller conveyor, purging system, complete fire suppression system, and equipped with 2 - 6 electronic filling scales. This module delivers in excess of 200 cylinders per hour depending on the operator.
MPM - Mobile Paint Module
The MPM is the paint module of the M-Series. Them MPM is a pressurized paint system complete with inlet and exhaust fans to keep the paint on the product, not on the booth. The MPM is capable of spraying and covering product conveyed at overhead line speeds from 8 - 12 feet per minute.
MDM - Mobile Dry Module
The MDM the mobile drying module of the M-Series Plant. It is equipped with the latest in catalytic infrared technology built and designed by DECOE, Inc. Our heat system components are Class 1 Division 1 rated and factory mutual approved for propane.
|
|
|
|
M-Series Production Sequence
Prep and Preheat
The cylinders are sorted, washed, and conveyed through the MDM.
The cylinder is rotated and conveyed past the preheat stage of the MDM
The preheat stage is to prepare the cylinder for paint by drying and warming the cylinder.
Prep and Preheat
The cylinders are sorted, washed, and conveyed through the MDM.
The cylinder is rotated and conveyed past the preheat stage of the MDM
The preheat stage is to prepare the cylinder for paint by drying and warming the cylinder.
Paint
The cylinder is conveyed to the MPM where the paint is automatically applied to the rotating cylinder as the cylinder passes a bank of paint guns
Final Dry
The cylinder re-enters the MDM for Final Dry stage
Upon exiting the MDM the cylinder passes through a Quench duct water deluge system to cool the tank for filling and curing of paint.
Filling
The cylinder is removed and placed on the driven roller conveyor of the MFM
The cylinder is conveyed and then placed onto the electronic filling scales for filling
The full cylinder is then placed on the exit conveyor
Sleeving and Storage
The cylinder is then conveyed to the Shuttle Sleeve machine for sleeving, capping, and palletizing for storage or transport.
|
A Few images from some of our Installations...
|
Copyright © 2004 DECOE, Inc. All rights reserved.
|